Awarded Bids
Auxiliary Building Phase 2 Mechanical Bid Tab

Bid Tabulation Auxiliary Building Phase II Mechanical

 

Charron Heating

Comfort System

1st Proposal

Install forced air 95% efficiency furnace and 5 ton AC system

Ductwork

Grills and register

Gas line and thermostat

$18833.00

$16872.26

2nd Proposal

Install forced air 95% efficiency furnace and 5 ton AC system

Ductwork, Grills and Register

Gas line and install thermostat

Zone System with zone dampers, zone board, bypass dampers and thermostats

$24053.00

$21789.50

3rd Proposal

Install a wall mount high wall air handler, set heat pumps condensers ground level and connect with refrigerant lines.

6 x individual heat pump ductless split

6 x high wall mounted air handlers

6 x Thermostats

6x Refrigerant lines

Travel

Labor start up and owner training

$21,806.64

$16,095.75